Details of Invoice 000-813, 08/29/01 through 09/18/01

Revision "B"

Hours Day Date Description
25.75
Wed.
08/29/01
Status report to Joe and Andy. Negotiations with CMTS for better assembly prices. Evaluation of Itamar's Loubia planning document. Sloader work with Itamar's source. Calls and e-mail with Innoveda. Short sloader report to Itamar. Got PADS working, conference call, fixing Loubia PCB files, making new Gerbers, checking, zipping it all together, emailing Continued to locate parts on an immediate need basis. Conducted research to find Cordless IP telephone. Assisted with Aplio, Yap Max, and Broadmedia testing.
17.75
Thu.
08/30/01
sp53 gateway checking result + echo testing report. Calls and e-mails to Mike Potochnik of CMAC. Assembly pricing work with CMTS. Review of CMAC modified Loubia Gerbers, creating ASCII netlist and sending to CMAC. Continuing to attempt to locate obscure parts as well as find acceptable substitutes. Continued research on cordless IP telephones:
Netsat cordless VOIP phone http://www.swift.net.sg/ipdetail.html#NETRAV Cordless IP Telephone

Ellkor WHF-7020, 900MHz, 40 channel, cordless internet telephone: http://www.ellkor.com/telecommunication/cordless_phones/whf_7020.html

NetLink IP Wireless Telephone, advanced Wireless Telephone providing voice communication integration to Cisco Systems' CallManager. http://www.spectralink.com/products/NetLinkIP.html

13.00
Fri.
08/31/01
Notes to Joe on Loubia assembly pricing. Sloader work. Mail with Dave; ship request to Bill Bryan. Continued parts location.
0.00
Sat.
09/01/01

1.00
Sun.
09/02/01
Mail with Itamar on sloader full install.
10.00
Mon.
09/03/01
Researching Digikey alternates for Loubia parts Locating parts alternatives and distributors for obscure components. Conducted online searches. Inductors and the dual RJ11 jack are found, but on long lead time schedules only.
15.00
Tue.
09/04/01
Mail with Itamar; calls and e-mail with CMAC. Notes to Joe regarding assembly pricing with CMTS. Mail with Bill Bryan amd Camdice. Invoicing notes to Joe and Sabrina Jackson. Researching Digikey alternates for Loubia parts, writing report. Continued online searches of distributors and manufacturers to attempts to find alternates for obscure components. Worked on activity report. To date, 72% of components ordered. All with ETA Friday, September 7, 2001.
12.00
Wed.
09/05/01
Further quoting with CMAC. Sloader mail and work with Mihai and Itamar. 8021 Aplio shipping. Parts purchase order work. Located remainder of components, placed orders. Conducted further research into Netrav's wireless IP telephone. Pinged for purchasing information. Awaiting Reply. Determined that Swift.Net is most likely the internet site of Netrav.
14.00
Thu.
09/06/01
Evaluation of status from Itamar. Loubia parts review and inventory. Parts price reduction work. All orders finalized, 95% of components will arrive on Friday, September 7, 2001. Remainder of components have been located and/or purchased; none are necessary to produce a testable board.
08.00
Fri.
09/07/01
Sloader work, misc. e-mail and parts research. Delivered parts. Continued to attempt to locate a distributor that cold provide timely delivery of the dual RJ11 connector.
0.00
Sat.
09/08/01

0.00
Sun.
09/09/01
12.00
Mon.
09/10/01
notes to vendor for assembly of first three Loubia cards. Short Loubia report to Itamar and team. Scheduling note to Andy. Note to Joe regarding arrival time of raw cards. Notes to Joe regarding country list. Notes to CMAC on certification. Inventoried and verified receipt of Loubia components.
12.00
Tue.
09/11/01
Notes to team on Loubia build schedule. Note to BBryan requesting power supplies. Note to Joe on Elkor and Spectralink phones. Calls and e-mail to CMAC trying to locate Loubia cards. Inventoried and verified receipt of Loubia components.
08.00
Wed.
09/12/01
Receipt and install of omniloader. Note to Mihai on 8021 Aplio. Creation of N2P ftp site on Adapticom1.net server.
12.00
Thu.
09/13/01
Status report to Andy. Research on socketing Flash. Work with French Orcad keys. Dissection of Broadmedia phone. Loubia price reduction work. Raw card shipping search. Rresearch sources of certification of Loubia for export.
10.50
Fri.
09/14/01
Raw card shipping search. Note to Joe on card shipment. Note to Joe on missing payment. Receipt, cleaning, and setup of Pascal's workstation. Quick notes on flash memory and using Loubia design as a phone Rresearch sources of certification of Loubia for export.
0.00
Sat.
09/15/01

6.00
Sun.
09/16/01
Removal of parts from obsolete Loubia cards for use in assembly of new cards.
10.00
Mon.
09/17/01
Tracking of Loubia cards mistakenly sent to Florida. Dissection of LG unit. Research specific requirements for each country on the certification list.
16.50
Tue.
09/18/01
Short raw card status report. Report to Joe on alternate Loubia form factors. Creation of Loubia documentation for assembly house. Broadmedia echo analysis and report on internal circuitry. Creation of invoice detail. Report on using Loubia design as an IP telephone - Creating, printing, scanning, emailing Loubia layout dwg to CMTS. Continued research of country requirements. Located a testing facility that can provide global certification.

203.50 Total Hours